Project Report | Nov 5, 2025
News on the Health Clinic

By Margaret Shackell | Mayor Potencial Volunteer

The team has put your funds to use and have made huge progress in the construction of the clinic. Pictures show a much easier to understand layout of the walls, doors, windows and hallways. The team started work on the roof for the 2nd half of the clinic and are moving into the plastering and polishing of it. Additionally, the internal divisions i.e. walls, doors, and windows can now be more easily measured as the team works on the plastering and polishing of the walls for the first half of the clinic which has been our key priority until now.
• The team is now starting to dig the trenches for the electrical cabling as well as plumbing.
• 3 light posts have been purchased and delivery is scheduled to El Rodeito.

The Next steps in construction will focus on:
• Finishing (smoothing/prepping for paint) exterior walls in the clinic – essentially this will smooth the walls and have them ready to be painted at a later point in the construction. They will use a water base primer paint for now.
• Finishing (smoothing/prepping for paint) interior walls of clinic, a special adhesive is used in this phase of construction to improve cement bonding to the walls and ceilings
• Finishing (smoothing) of the roof on the 2nd half of construction
• Installation of main electrical feed from the main road to the clinic building – this involves feeding main electrical cables from the street, installing the electrical poles, and bringing the main electrical cables underneath the construction.
• Bathroom installation and ceramic flooring on bathrooms

We are excited with what has happened so far, and we appreciate your donations in the past and in the future.

Links:

Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

Mayor Potencial

Location: Marathon, NY - USA
Website:
Facebook: Facebook Page
X / Twitter: Profile
Project Leader:
first4131212 last4131212
United States

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.